2017

2017

Designing and installing fiber optic cable project

Designing and installing fiber optic cable project of the Provincial Electricity Authority of Thailand 
in North & Northeast areas to support the deployment of the IP Access Network, a total distance of 2,216 kilometers.

2016

2016

Design and installation of closed-circuit television systems project

Design and installation of closed-circuit television systems project of State Railway of Thailand in Southern area, 20 stations and one service station at center, total of 319 cameras.

2015

2015

Design procurement and installation the network and fiberglass cable project

Design, procurement and installation of Next Generation Network communications equipment,
43 nodes, and the design of fiberglass cable project in the northern area, including Chiang Mai, Chiang Rai, Mae Hong Son, Phayao, total 900 Kilometers. Both projects are owned by the Provincial Electricity Authority of Thailand. 

2014

2014

ADSS fiber optic cable design project

The ADSS fiber optic cable design project of the Metropolitan Electricity Authority of Thailand (MEA), supported 10,188 electricity meters.

Repair and maintenace fiber optic cable network in service 24-hour project of the Provincial Electricity Authority of Thailand (PEA) in 12 areas around the country, totaling 10,000 km for the period of 3 years.

2013

2013

Build 180 radio stations and fiber optic cable networks project

Build 180 radio stations and fiber optic cable networks for Communications Authority of Thailand